Work Product (Artifact): Pre-Production DR Test Results
The results of the Pre-Production DR test.
Relationships
RolesResponsible: Modified By:
Main Description
Details regarding the Pre-Production DR testing conducted for the application.
Properties
Optional
Planned
Tailoring
Impact of not havingThere is no confirmation that the Recovery Strategy identified will work properly in the recovery of the application.
Reasons for not needingIf there is no Pre-Production DR test.