It's easy for a large organization to lose track of documents over time if effective guidelines are not available. Over
a short period of time, one can quickly see the erosion of document tracking and team members quickly become frustrated
locating information. The team and organization should name its documents - which are considered assets of the
organization - in a way that is consistent across programs, consistent across projects, and so that team members
crossing projects can quickly identify contents of a particular document.
Document Naming Guidelines provides a structured mechanism to name documents. The following figure shows the logical
breakdown of each component of the document name:
Application Code
(upper case, 5 chars) - A code that is unique to the application. Use “QAINT” for QA Internal documents and templates
that are not associated with an application
Prefix: - Document type
(upper case, 3 chars) – The first three letters of the file name give an indication of the type of document. (see full
list next page)
Document Number
(3 numeric) – gives the unique number of the document. Documents of the same prefix are sequentially numbered to keep
them unique
Sequence
(3 numeric) – gives a sequencing number to a series of documents which contain minor variations of essentially the same
information (example – a presentation of information that may be slightly modified for each audience it is presented
to)
Document Title
(mixed case, max 30 chars, no spaces)
Describes the purpose or business of the document. Acronyms, capitalizations, abbreviations can be used, keep in mind
that descriptions should be meaningful to anyone reading the file name
Use only alpha-numeric characters, plus the hyphen and underscore
Do not use spaces
Document Status
(upper case, max 4 chars, optional)
Start with DR1 (Draft 1) when the document is first created and end with FIN (FINal) to allow version control and
tracking.
Documents that have version number included within the document need not indicate Draft or FINal status
Document Examples
|
SVCNW-BRD-001-000-BusReqsFunctional.docx
|
Functional business requirements for the Service Now project. Version and date control are managed
within the document
|
|
SVCNW-BRD-002-000-BusReqsDetail.docx
|
Detailed business requirements for the Service Now project. Version and date control are managed within
the document
|
|
SVCNW-PRE-001-001-ITSecurityUserPresentation.ppt
|
Presentation to the IT Security users on how the project will impact them.
|
|
SVCNW-PRE-001-002-EntRiskUserPresentation.ppt
|
Presentation to the Enterprise Risk users on how the project will impact them. Note because this is
basically the same presentation as used for the IT Security team, we increment the “FLOW” sequence by
one
|
|
SVCNW-PRE-002-000-ProjectTeamTestingPresentation.ppt
|
Presentation to the Service Now project team on how they will need to integrate testing into the
project. Note this is a different presentation than the prior presentations, so we increment the
DOCUMENT NUMBER counter by one
|
Prefix Codes
Requirements Management Documents
CODE
|
NAME
|
BRD
|
Business Requirement Document
|
BZR
|
Business Rules
|
CTQ
|
CTQ Tree
|
INV
|
Inventory Report / List
|
MET
|
Metrics
|
PRC
|
Process Map
|
RAC
|
RACI Chart / Roles & Responsibilities
|
RTR
|
Requirements Traceability Matrix
|
SHP
|
Stakeholder Presentation
|
SIP
|
SIPOC
|
UCS
|
Use Case
|
VSN
|
Vision Document
|
Technology Management Documents
CODE
|
Name
|
APD
|
Architecture Profile Document
|
SAD
|
Software Architecture Document
|
Quality Management Documents
CODE
|
Name
|
DFT
|
Defect Tracking Log
|
DMR
|
Defect Metrics Reporting
|
QAP
|
Quality Approach Document
|
QMP
|
Quality Management Plan
|
TPL
|
Test Plan
|
QTR
|
Quality Testing Requirements
|
TSC
|
Test
Scripts
|
TSD
|
Test
Data Sheet
|
Codes for Projects and Events
|
ACP
|
Activity Completion Form
|
|
|
ACT
|
Action List
|
Action items drawn from minutes or a meeting
|
|
AGD
|
Agenda
|
Meeting agendas
|
|
AGR
|
Agreement
|
|
|
CAL
|
Calendar
|
|
|
CHK
|
Checklist Document
|
|
|
CPL
|
Communication Plan
|
|
|
GDL
|
Guideline / Training Document
|
|
|
GLO
|
Glossary
|
|
|
JDS
|
Job Description
|
|
|
MAN
|
Manual
|
Collection of information about a service or system
|
MAP
|
Map
|
Maps including floor plans
|
MEM
|
Memorandum
|
|
MEM
|
Memorandum
|
Internal Communication
|
MIN
|
Minutes and Notes
|
Records of meetings, formal and informal
|
OLA
|
Operating Level Agreement
|
Defines the interdependent relationships between internal support areas working together to support
an SLA
|
ORD
|
Order
|
An order placed with an external supplier
|
ORG
|
Organisational Chart
|
A chart indicating the relationships between different departments or organisational areas.
|
PCR
|
Project Change Request Form
|
|
PIR
|
Post Implementation Review
|
|
PLN
|
Plan
|
Planning documentation. Includes Strategic Plans, Action Plans, (Use LTP for LESSON teaching plans
and IRP for School Information Resource Plans).
|
PNF
|
Project Notification Forem
|
|
POL
|
Policy
|
Official departmental or divisional Policy
|
POS
|
Position Description
|
Documentation describing the roles and responsibilities of a particular role.
|
PPL
|
Project Plan
|
|
PRE
|
Presentation
|
Slides and/or notes for a presentation
|
PRO
|
Procedure
|
Procedures and work instructions
|
PRP
|
Proposal
|
|
PRQ
|
Purchase Requisition
|
Documentation relating to requests for the purchase of goods and services
|
PSC
|
Scholarly publication
|
Including conference papers
|
PUB
|
Publication
|
Publications for informational and promotional purposes, including social newsletters
|
PUR
|
Purchase Order
|
Documentation indicating types, quantities, and agreed prices for products or services the seller
will provide to the buyer
|
RAW
|
Raw Data
|
Any type of file containing Raw Data collected by any means. This file stores the original data
before it is modified into any type of report, graph, correspondence etc.
|
REP
|
Report
|
Including Monthly, Quarterly, Yearly Reports.
|
RMP
|
Risk Management Plan
|
|
ROS
|
Roster
|
Documentation about staff working arrangements
|
RPK
|
Release Package
|
|
SBG
|
Subject Example Document
|
|
SLA
|
Service Level Agreement
|
Defines the agreed upon support relationship between a service provider and its clients
|
SLO
|
Service Level Objective
|
Defines the anticipated support relationship between a service provider and its clients
|
SPC
|
Specification
|
A detailed description or assessment of requirements, dimensions, materials, etc.,
|
STA
|
Statistical tracking
|
Data (numerical) evaluating or tracking services or performance. Statistical spreadsheets and other
evaluation data
|
STD
|
Standard
|
Documents describing standards or conventions. Use GDL for actual guidelines, and other applied use
of standards
|
STR
|
Status Reports
|
|
SUB
|
Submission
|
Formal submission to a review
|
SVY
|
Survey
|
Questionnaires for distribution, for survey templates use TEM
|
TEM
|
Template
|
An electronic file with a predesigned, customized format and structure, as for a fax, letter, or
expense report, ready to be filled in.
|
TIM
|
Timeline
|
Document describing timing.
|
TSH
|
Timesheet
|
Documentation relating to staff members working hours
|
WPT
|
Web page test
|
Web pages planned or done first in a text based editor before loaded as HTML
|
Teaching / Training Documents
CODE
|
Name
|
Description
|
ASS
|
Assessment
|
Learning-related assessment
|
LTE
|
Learning Teaching Evaluation
|
Learning / Teaching – to evaluate our teaching / resources, etc. Forms, activities, tools,
evaluation summaries.
|
LTP
|
Lesson Teaching Plan
|
Learning / Teaching. Note: strategic learning and teaching plans should use PLN.
|
LTR
|
Learning/ Teaching Resources
|
Learning / Teaching. Activity sheets, quizzes, handouts.
|
SBG
|
Subject Guide
|
Documentation describing useful subject resources
|
WSH
|
Workshop
|
Documentation prepared for workshops
|
General and Operational Documents
CODE
|
Name
|
Description
|
AGR
|
Agreement
|
Agreement between two or more parties e.g. Annual Maintenance Agreement
|
BGT
|
Budget
|
Documentation relating to budgets, including budget forecasts, budget tracking sheets etc
|
COR
|
Correspondence
|
All correspondence to and from external parties; Emails, letters, faxes etc
|
EOI
|
Expression of Interest
|
EOI’s for job opportunities, grant applications, fellowships, call for project tenders
|
EVL
|
Evaluation
|
Evaluation and Feedback documentation,
eg
for workshops, conferences, seminars, etc ( Form Templates use TEM)
|
FRM
|
Form
|
Completed forms only, form templates use TEM. E.g. Copies of requests to attend staff Training (the
green form)
|
GDL
|
Guidelines
|
Documents produced for staff outlining guidelines for processes or activities
|
EXM Example Example
provides practical application of a concept, methodology, or process.
|